One Source
SECNAV Latest
  
  
  
  
RDA Document Page
  
RDA Section
  
RDA Document Description
  
Folder: Contracting With EVM2.1
  
Folder: Tools and Examples2.1
  
Folder: BUS-FM1.0BUS-FM
  
Folder: EVM Policy and Guidance1.0EVM Policy and Guidance
  
Folder: About CEVM1.0
  
SampleNavyCEVMIPMRIMSOnlyCDRL20120829.pdf2.7IPMR Format 6 Standalone CDRL 
  
CEVM
SampleNavyCEVMIPMRCDRL201201115Part1.pdf2.7Sample Navy CEVM CDRL 20120822 Part 1
  
CEVM
CDRL IPMR DoD Form 1423.1 - The CDRL is the contract vehicle requiring the Contractor to provide the Government a product deliverable, in this example, an Integrated Program Management Report (IPMR) . This CDRL is completed in accordance with Data Item Description (DID) DI-MGMT-81861 Integrated Program Management DID and provides additional/clarifying information and information on tailoring of documents in Block 16 of the CDRL. Note it does not include the XML submission signature and zipping requirements that will be posted directly on the EVM Central Repository web site. Also note this CDRL replaces the prior CPR and IMS CDRLs that were consistent with the related DIDs DI-MGMT-81466A and DI-MGMT-81650 as of 1 Jul 2012. The combination of the IMS and CPR CDRL and the options within the IPMR DID forced a 3 page CDRL. The two page form on the assist website was used, pages 1-2 are part 1 and page 3 is part 2.
SampleNavyCEVMIPMRCDRL20121115Part2.pdf2.7Sample Navy CEVM CDRL 20120822 Part 2
  
CEVM
CDRL IPMR DoD Form 1423.1 - The CDRL is the contract vehicle requiring the Contractor to provide the Government a product deliverable, in this example, an Integrated Program Management Report (IPMR) . This CDRL is completed in accordance with Data Item Description (DID) DI-MGMT-81861 Integrated Program Management DID and provides additional/clarifying information and information on tailoring of documents in Block 16 of the CDRL. Note it does not include the XML submission signature and zipping requirements that will be posted directly on the EVM Central Repository web site. Also note this CDRL replaces the prior CPR and IMS CDRLs that were consistent with the related DIDs DI-MGMT-81466A and DI-MGMT-81650 as of 1 Jul 2012. The combination of the IMS and CPR CDRL and the options within the IPMR DID forced a 3 page CDRL. The two page form on the assist website was used, pages 1-2 are part 1 and page 3 is part 2.
cevmsraoverview.pptx2.8Schedule Risk Assessment Overview
  
Schedule Training

This training snippet provides an overview of the Schedule Risk Assessment process. The presentation discusses generally why an SRA is required, how the process works, roles and responsibilities, and the review of SRA results.

Archived
cevmschedulemargin.pptx2.8 Schedule Margin
  
Schedule Training

The IPMR DID formally recognized schedule margin as a valid program management tool. This training snippet discusses the use of schedule margin, the way it can be modeled, and the standards that have been defined for its use.

Archived
cevmieacs.pptx2.9Evaluating the Estimate at Completion
  
EVM Training

This training snippet provides instruction on how to evaluate a contractor's EAC position using IEAC and TCPI to CPI analysis.

Archived
CEVMIPMRTraining.pptx2.9CEVM IPMR Training
  
CEVMEVM Training
Archived
cevmevmpolicy.pptx2.9EVM Policy
  
EVM Training

This snippet provides an overview of EVM Requirements as established in DOD Work Instruction 5000.02, the DFARs, and the policy letter which implemented IPMR reporting.

Archived
cevmoverviewofcompliancesurveillanceandintegratedbaselinereviews.pptx2.9 Overview of Compliance, Surveillance, and Integrated Baseline Reviews
  
EVM Training

This training snippet provides a brief description of Compliance Reviews, Integrated Baseline Reviews, and Surveillance Reviews. It highlights the differences between them in purpose, approach, responsibility, and participation.

Archived
cevmrecognitionofscopechangeintheipmr.pptx2.9Recognition of Scope Change in the IPMR
  
EVM Training

This training snippet attempts to explain how various types of contractual scope changes are to be reflected in IPMR & CPR reporting. It provides definitions for key terms, cites applicable sections of the IPMR DID, provides an example for both a scope addition and scope removal, and discusses the correct use of Authorized Unpriced Work.

Archived
cevmreplanningreprogrammingspas.pptx2.9Replanning, Reprogramming & SPAs
  
EVM Training

This training snippet discusses the definitions of Replanning, Reprogramming, and Single Point Adjustments, and it provides examples to demonstrate the impacts of these different rebaseline options on program reporting metrics. Finally, it discusses the use of reporting metrics in a post-OTB scenario.

Archived
cevmvalidatingtheipmrcprandimsdeliverables.pptx2.9Validating IPMR/CPR/IMS Deliverables
  
EVM Training

This training snippet provides some basic validations to be performed monthly on IPMR, CPR, and IMS deliverables in order to assure a basic level of data/deliverable quality.

Archived
cevmpricevsusagevarianceanalysis.pptx2.9Price Vs. Usage Variance Analysis
  
EVM Training

This training snippet discusses the application of price versus usage analysis for better understanding material and labor variances on EVM contracts.

Archived
cevmcosthealthchecks.pptx2.9Cost Health Check
  
EVM Training

The Cost Health Check Snippet discusses six quick checks that can be performed to gauge the overall health of cost data for an earned value contract.

Archived