Skip Ribbon Commands
Skip to main content
DEPARTMENT OF THE NAVY ISSUANCES
SECNAV Latest
  
  
  
  
  
  
  
  
  
OPNAV
  
PROJECTED OPERATIONAL ENVIRONMENT AND REQUIRED OPERATIONAL CAPABILITIES FOR NAVY EXPEDITIONARY LOGISTICS SUPPORT GROUP10/17/2018ActiveN95NoNo
42
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE10/25/2018ActiveN95NoNo
109
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR MOBILE DIVING AND SALVAGE UNITS4/4/2014ActiveN95NoNo
42
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR SAFEGUARD (T-ARS 50) CLASS SALVAGE SHIPS2/13/2015ActiveN42NoNo
32
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE HENRY J. KAISER (T-AO 187) CLASS FLEET REPLENISHMENT OILER2/13/2015ActiveN42NoNo
32
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR CG 47 (TICONDEROGA) CLASS GUIDED MISSILE CRUISERS9/9/2012ActiveN96NoNo
76
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR T-AH 19 MERCY CLASS HOSPITAL SHIPS11/8/2011ActiveN42NoNo
52
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR AVENGER CLASS MINE COUNTERMEASURES SHIPS7/5/2017ActiveN95NoNo
32
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR POWHATAN (T-ATF 166) CLASS FLEET OCEAN TUG2/13/2015ActiveN42NoNo
32
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE T-AOT OCEAN TRANSPORT TANKER1/18/2008ActiveN42NoNo
12
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE T-AK, T-AKR, T-AKE, T-AOT AND MOBILE LANDING PLATFORM ASSIGNED TO THE MARITIME PREPOSITIONING FORCE8/15/2011ActiveN422NoNo
22
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR STRATEGIC SEALIFT SHIPS TO INCLUDE THE T-AKR FAST SEALIFT SHIPS (FSS), LARGE MEDIUM SPEED RO/RO (LMSR), AVIATION SUPPORT SHIPS12/17/2007ActiveN422NoNo
14
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE SUPPLY (T-AOE 6) CLASS FAST COMBAT SUPPORT SHIPS2/13/2015ActiveN42NoNo
31
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR CARRIER AIRBORNE EARLY WARNING SQUADRON ONE TWO ZERO (VAW-120) FLEET REPLACEMENT SQUADRON3/15/2011ActiveN88NoNo
21
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR TACTICAL AIR CONTROL GROUPS5/8/2013ActiveN95NoNo
16
OPNAV
  
PROJECTED OPERATIONAL ENVIRONMENT AND REQUIRED OPERATIONAL CAPABILITIES LSD 41 (WHIDBEY ISLAND AND CARGO VARIANT) CLASS DOCK LANDING SHIPS3/25/2014ActiveN95NoNo
75
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR AMPHIBIOUS COMMAND SHIP (LCC-20) MOUNT WHITNEY4/8/2014ActiveN96NoNo
120
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET AIR RECONNAINSSANCE SQUADRON SEVEN (VQ-7)10/16/2014ActiveN98NoNo
45
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR LCC-19 (BLUE RIDGE) COMMAND SHIP5/8/2013ActiveN96NoNo
79
OPNAV
  
PROJECTED OPERATIONAL ENVIRONMENT AND REQUIRED OPERATIONAL CAPABILITY FOR THE NAVY FORWARD DEPLOYABLE PREVENTIVE MEDICINE UNIT8/14/2012ActiveN931NoNo
19
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE LITTORAL COMBAT SHIP4/8/2014ActiveN96NoNo
215
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR LPD 17 (SAN ANTIONIO) CLASS AMPHIBIOUS TRANSPORT DOCK SHIPS8/28/2017ActiveN95NoNo
81
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR COASTAL RIVERINE FORCES4/10/2014ActiveN95NoNo
79
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE LEWIS AND CLARK (T-AKE 1) CLASS DRY CARGO AND AMMUNITION SHIP8/3/2016ActiveN42NoNo
33
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NAVAL EXPLOSIVE ORDNANCE DISPOSAL TECHNOLOGY DIVISION TECHNICAL SUPPORT DETACHMENT10/24/2013ActiveN95NoNo
35
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NAVY EXPEDITIONARY INTELLIGENCE COMMAND FORCES10/19/2018ActiveN95NoNo
26
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NAVY PUBLIC AFFAIRS SUPPORT ELEMENT5/1/2017ActiveN09CNoNo
18
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR JOINT HIGH SPEED VESSEL LOGISTICS SHIPS2/14/2012ActiveN42NoNo
32
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR LHA 6 (AMERICA) CLASS AMPHIBIOUS ASSAULT SHIP2/12/2014ActiveN95NoNo
221
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NAVY EXPEDITIONARY COMBAT FORCES CENTRAL AND COMMANDER, TASK FORCE FIVE SIX1/19/2016ActiveN95NoNo
44
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR MINE COUNTERMEASURES SQUADRON FIVE AND SEVEN STAFF10/27/2016ActiveN95NoNo
42
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR TACTICAL AIR CONTROL SQUADRONS12/17/2012ActiveN95NoNo
23
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NAVAL BEACH GROUPS AND THEIR ELEMENTS2/8/2016ActiveN95NoNo
191
OPNAV
  
ROC AND POE FOR THE WHEC -378 (HAMILTON) CLASS HIGH ENDURANCE CUTTER (U)5/21/1987ActiveN96NoNo
38
OPNAV
  
(U) (ROC) AND (POE) FOR THE WHEC -378 (HAMILTON) CLASS HIGH ENDURANCE CUTTER (U)6/20/2019ActiveN766CNoNo
38
OPNAV
  
ROC AND POE FOR THE WAGB 399 (POLAR) CLASS ICEBREAKER (U)3/31/1988ActiveN96NoNo
52
OPNAV
  
ROC AND POE FOR THE WPB 110 (ISLAND) CLASS PATROL BOAT (U)4/5/1988ActiveN96NoNo
38
OPNAV
  
REQUIRED OPERATIONAL CAPABILITES AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET F/A-18A/C STRIKE FIGHTER SQUADRONS (U)7/13/2010ActiveN882CNoNo
31
OPNAV
  
POE AND ROC STATEMENTS FOR THE INTEGRATED UNDERSEA SURVEILLANCE SYSTEM (IUSS) (U)3/14/1995ActiveN2N6FNoNo
58
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR THE FLEET HELICOPTER MINE COUNTERMEASURES SQUADRON6/16/2017ActiveN98NoNo
27
OPNAV
  
ROC AND POE FOR THE WMEC 210 (RELIANCE) CLASS MEDIUM ENDURANCE CUTTER (U)7/17/1989ActiveN96NoNo
54
OPNAV
  
ROC AND POE FOR THE WMEC 270 (BEARS) CLASS MEDIUM ENDURANCE CUTTER (U)12/19/1989ActiveN96NoNo
56
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET AIR RECONNAISSANCE SQUADRON ONE (VQ-1) (U)9/20/2013ActiveN98NoNo
47
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR SUBMARINE TENDERS (U)7/16/2014ActiveN97NoNo
64
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR COMMAND AND CONTROL SQUADRONS4/22/2014ActiveN98NoNo
38
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR AIR TEST AND EVALUATION SQUADRON ONE1/16/2018ActiveN98NoNo
47
OPNAV
  
PROJECTED OPERATIONAL ENVIRONMENT AND REQUIRED OPERATIONAL CAPABILITIES FOR FLEET PATROL SQUADRONS (VP) (U)11/1/2013ActiveN98NoNo
67
OPNAV
  
POE AND ROC FOR THE AGDS AND T-AGM MISSION RANGE INSTRUMENTATION AND FBM NAVIGATION SUPPORT SHIPS (U)12/12/1991ActiveN98NoNo
14
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR RESERVE F/A-11 STRIKE FIGHTER SQUADRONS (U)3/31/2014ActiveN98NoNo
35
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR CARRIER STRIKE GROUP STAFF11/1/2018Activen98NoNo
82
OPNAV
  
(U) MISSION AREAS AND REQUIRED OPERATIONAL CAPABILITY PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS 6/30/2017ActiveN3/N5NoNo
337
OPNAV
  
REQUIRED OPERATIONAL CAPABILILTY AND PROJECTED OPERATIONAL ENVIRONMENT FOR ELECTRONIC ATTACK SQUADRON ONE TWO NINE10/24/2014ActiveN98NoNo
31
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITIES PROJECTED OPERATIONAL ENVIRONMENT FOR RESERVE EA-18G ELECTRONIC ATTACK SQUADRON TWO ZERO NINE6/20/2017ActiveN98NoNo
40
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NUCLEAR ATTACK SUBMARINES (U)11/1/2010ActiveN87NoNo
48
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT11/18/2013ActiveN98NoNo
28
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR VX-93/6/2017ActiveN98NoNo
47
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR RESERVE FIGHTER SQUADRON COMPOSITE TWELVE9/20/2018ActiveN98NoNo
33
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR PATROL SQUADRON THIRTY (U)3/18/2014ActiveN98NoNo
52
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET FA-18E/F STRIKE FIGHTER SQUADRONS (U)8/15/2014ActiveN98NoNo
44
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET HELICOPTER MARITIME STRIKE CARRIER AIR  WING (U)4/2/2014ActiveN98NoNo
44
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET HELICOPTER MARITIME STRIKE CARRIER AIR WING10/3/2019ActiveN98NoNo
41
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY FOR FLEET UNMANNED PATROL SQUADRONS AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET UNMANNED PATROL SQUADRON NINETEEN (VUP-19) STATEMENTS(U)10/16/2014CancelledN98NoNo
47
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILTIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET UNMANNED PATROL SQUADRONS7/8/2019ActiveN98NoNo
41
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OEPRATIONAL ENVIRONMENT FOR FLEET CARRIER AIR WING/EXPEDITIONARY/FORWARD DEPLOYED NAVAL FORCES EA-18G ELECTRONIC ATTACK SQUADRON (VAQ/EXP/FDNF) (U)1/5/2015ActiveN98NoNo
48
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIROMENT FOR FLEET F35C STRIKE FIGHTER SQUADRON4/16/2015ActiveN98NoNo
40
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET HELICOPTER SEA COMBAT EXPEDITIONARY SQUADRONS5/18/2015ActiveN98NoNo
39
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NUCLEAR GUIDED MISSILE SUBMARINES (U)11/18/2010ActiveN87NoNo
39
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR RESERVE FIGHTER SQUADRON COMPOSITE ONE ONE ONE6/22/2017ActiveN98NoNo
14
OPNAV
  
REQUIRED OPERATIONAL CAPBALITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR FIGHTER SQUADRON COMPOSITE THIRTEEN (U)2/19/2016ActiveN98NoNo
18
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NAVY TACTICAL MOBILE SYSTEMS (U)3/25/2014ActiveN98NoNo
40
OPNAV
  
(U) E-2D REQUIRED OPERATION CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR COMMAND AND CONTROL SQUADRONS5/15/2015ActiveN98NoNo
27
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR P-3C RESERVE FLEET PATROL SQUADRONS (VP)5/18/2015ActiveN98NoNo
62
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET BALLISTIC MISSILE SUBMARINES1/28/2019ActiveN97NoNo
24
OPNAV
  
(U) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR ATLANTIC AND PACIFIC FLEET CARRIER AIR WING MH-60S HELICOPTERS SEA AND COMBAT SQUADRONS6/7/2017ActiveN98NoNo
32
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OEPRATIONAL CAPABILITY FOR HELICOPTER SEA COMBAT SQUADRONS EIGHT FOUR AND EIGHT FIVE (U)2/26/2018ActiveN98NoNo
37
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR ATLANTIC AND PACIFIC FLEET AND RESERVE EXPEDITIONARY MH-60R HELICOPTER MARITIME (U)2/19/2016ActiveN98NoNo
51
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR MULTI-PURPOSE, NUCLEAR-POWERED AIRCRAFT CARRIER3/18/2014ActiveN98NoNo
290
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR C-2A FLEET LOGISTICS SUPPORT SQUADRONS3/3/2016ActiveN98NoNo
24
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR STRIKE FIGHTER SQUADRON ONE ZERO SIX FLEET REPLACEMENT SQUADRON10/24/2014ActiveN98NoNo
17
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR CYCLONE CLASS PATROL COASTAL SHIPS9/14/2015ActiveN96NoNo
41
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR NAVY C-20G SQUADRONS3/26/2014ActiveN98NoNo
27
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR NAVY C-130T SQUADRONS9/14/2015ActiveN98NoNo
24
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR WASP CLASS AMPHIBIOUS ASSAULT SHIPS (LHD 1)4/10/2014ActiveN95NoNo
177
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR (ARLEIGH BURKE) CLASS GUIDED MISSILE DESTROYERS7/28/2017ActiveN96NoNo
101
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR AMPHIBIOUS SQUADRON COMMANDERS8/27/2013ActiveN95NoNo
39
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR EXPEDITIONARY STRIKE GROUP STAFFS9/9/2011ActiveN8823NoNo
61
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR STRIKE FIGHTER SQUADRON ONE TWO TWO FLEET REPLACEMENT SQUADRON2/22/2018ActiveN98NoNo
15
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR NAVY C-40A SQUADRONS3/19/2014ActiveN98NoNo
23
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR HELICOPTER MARITIME STRIKE SQUADRON FLEET REPLACEMENT SQUADRONS (HSM-40/41)4/16/2015ActiveN98NoNo
14
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR DESTROYER SQUADRON STAFFS 1, 2, 9, 21, 22, 23, 26, 28, and 311/6/2015ActiveN96NoNo
41
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR HELICOPTER SEA COMBAT SQUADRONS TWO AND THREE (HSC-2/3)10/28/2013ActiveN98NoNo
26
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE 175-FOOT COASTAL BUOY TENDER - KEEPER CLASS11/24/2010ActiveN86NoNo
56
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE 225-FOOT SEAGOING BUOY TENDER - JUNIPER CLASS11/24/2010ActiveN86NoNo
58
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET READINESS CENTER NORTHWEST EA-18G VAN OPERATIONAL DETACHEMENTS10/16/2013ActiveN98NoNo
19
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR STRIKE FIGHTER SQUADRON ONE ZERO ONE FLEET REPLACEMENT SQUADRON3/28/2014ActiveN98NoNo
17
OPNAV
  
REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR HELICOPTER MINE COUNTERMEASURES REPLACEMENT SQUADRON TWELVE (HM-12)7/6/2015ActiveN98NoNo
17
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR MOBILE LANDING PLATFORM 3 AFLOAT FORWARD STAGING BASE CLASS SHIPS9/29/2015ActiveN95NoNo
64
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR AEGIS ASHORE MISSILE DEFENSE SYSTEM ROMANIA AND AEGIS ASHORE MISSILE DEFENSE FACILITY DEVESELU ROMANIA8/5/2015ActiveN96NoNo
25
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR (ZUMWALT) CLASS GUIDED MISSILE DESTROYERS9/28/2015ActiveN96NoNo
78
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR ADMINISTRATIVE DESTROYER SQUADRON STAFFS 7, 40, 50 AND 602/17/2016ActiveN96NoNo
58
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENTS FOR EXPLOSIVE ORDNANCE GROUP FORCES4/20/2011ActiveN95NoNo
335
OPNAV
  
REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR SPECIAL PROJECT PATROL SQUADRON TWO (VPU-2) (U)9/20/2013ActiveN98NoNo
53
OPNAV
  
(U) REQUIRED OPERATIONA L CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENT FOR E-6B FLEET AIR RECONNAISSANCE SQUADRONS THREE AND FOUR7/28/2017ActiveN98NoNo
43